Item 01 - August 10, 2016 Minutes
Item 01 - August 10, 2016 Minutes.pdf
Item 02 - SW52-16 Doniphan Stormwater Pump Station Improvements
Item 02 - SW52-16 Doniphan Stormwater Pump Station Improvements.pdf
Item 03 - Fundraising activities for the Salvation Army
Item 03 - Fundraising activities for the Salvation Army.pdf
Item 04 - Safe Water's Eleven-Year Directors Award
Item 04 - Safe Water's Eleven-Year Directors Award.pdf
Item 05 - Budget Presentation Award
Item 05 - Budget Presentation Award.pdf
Item 06 - Engineering Consultant Contract Distribution
Item 06 - Engineering Consultant Contract Distribution.pdf
Item 07 - Fred Hervey Plant Digester Two Mixer Improvements
Item 07 - Fred Hervey Plant Digester Two Mixer Improvements.pdf
Item 08 - Fred Hervey Plant Aeration Basins Pilot Study
Item 08 - Fred Hervey Plant Aeration Basins Pilot Study.pdf
Item 09 - Water/Wastewater Facilities Beautification Project
Item 09 - Water/Wastewater Facilities Beautification Project.pdf
Item 10 - Emergency Backup Power at Wastewater Plants
Item 10 - Emergency Backup Power at Wastewater Plants.pdf
Item 11 - Haskell Plant Odor Control
Item 11 - Haskell Plant Odor Control.pdf
Item 12 - Bid SW24-15 Keystone Dam Intake Structure Modifications
Item 12 - Bid SW24-15 Keystone Dam Intake Structure Modifications.pdf
Item 13 - Bid SW42-16 Fairbanks Sediment Catch Structure
Item 13 - Bid SW42-16 Fairbanks Sediment Catch Structure.pdf
Item 14 - Bid 30-16 Resler, North of Transmountain 24-inch Transmission Main Phase III
Item 14 - Bid 30-16 Resler, North of Transmountain 24-inch Transmission Main Phase III.pdf
Item 15 - Bid 45-16 Pre-Purchase of Equipment for Emergency Backup
Item 15 - Bid 45-16 Pre-Purchase of Equipment for Emergency Backup.pdf
Item 16 - Bid 62-16 Canal Plant Long Term Structural Repairs Phase 2
Item 16 - Bid 62-16 Canal Plant Long Term Structural Repairs Phase 2.pdf
Item 17 - Bid 64-16 Northwest 24-inch reclaimed water line relocation
Item 17 - Bid 64-16 Northwest 24-inch reclaimed water line relocation.pdf
Item 18 - Emergency Purchase Order Frontera Force Main System
Item 18 - Emergency Purchase Order Frontera Force Main System.pdf
Item 19 - Installation and pipeline repairs on Frontera Force Mains
Item 19 - Installation and pipeline repairs on Frontera Force Mains.pdf
Item 20 - Emergency Purchase Order for repair of piping at Sunland Park Lift Station
Item 20 - Emergency Purchase Order for repair of piping at Sunland Park Lift Station.pdf
Item 21 - Purchase order for 24-inch ductile iron pipe
Item 21 - Purchase order for 24-inch ductile iron pipe.pdf
Item 22 - Agreement with Environmental Systems Research Institute, Inc.
Item 22 - Agreement with Environmental Systems Research Institute, Inc..pdf
Item 23 - Partner with U.S. Army Corps of Engineers for Interior Drainage Project
Item 23 - Partner with U.S. Army Corps of Engineers for Interior Drainage Project.pdf
Item 24 - Agreement with Lower Valley Water District to provide service
Item 24 - Agreement with Lower Valley Water District to provide service.pdf
Item 25 - Bid 58-16, 48-inch precast concrete manholes
Item 25 - Bid 58-16, 48-inch precast concrete manholes.pdf
Item 26 - Bid 59-16, 72-inch precast concrete manholes
Item 26 - Bid 59-16, 72-inch precast concrete manholes.pdf
Item 27 - PSB Member Selection timeline
Item 27 - PSB Member Selection timeline.pdf
Item 28 - PSB Budget Meeting schedule
Item 28 - PSB Budget Meeting schedule.pdf
Item 30 - Condition and capacity of El Paso Water headquarters
Item 30 - Condition and capacity of El Paso Water headquarters.pdf